Humberwest Re-Channelization for High Rise Development

  • Project: DiPoce Management Inc.
  • Location: Humberwest Parkway, Goreway Drive and Highway 7, Brampton, Ontario
  • Size: 5.12 Acres
  • Start of Construction: Spring 2019
  • Project Completion: Ongoing - Ready for Terra Seeding July 31, 2019

To increase the developable area on this 5.12 acre site for a proposed 400 unit high-rise building, an existing channel down the middle of the property was re-routed along the property boundaries.  The re-channelization also helped to beautify the property.